{"id":69965,"date":"2026-01-30T15:57:25","date_gmt":"2026-01-30T18:57:25","guid":{"rendered":"https:\/\/tech.einnews.com\/article\/888017552"},"modified":"2026-01-30T15:57:25","modified_gmt":"2026-01-30T18:57:25","slug":"char-tech-begins-commissioning-for-thorold-facility","status":"publish","type":"post","link":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/2026\/01\/30\/char-tech-begins-commissioning-for-thorold-facility\/","title":{"rendered":"Char Tech begins commissioning for Thorold facility"},"content":{"rendered":"<div><img data-opt-id=758893364  fetchpriority=\"high\" decoding=\"async\" src=\"data:image\/gif;base64,R0lGODlhAQABAIAAAAAAAP\/\/\/ywAAAAAAQABAAACAUwAOw==\" fifu-lazy=\"1\" fifu-data-sizes=\"auto\" fifu-data-srcset=\"https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=75&resize=75&ssl=1 75w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=100&resize=100&ssl=1 100w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=150&resize=150&ssl=1 150w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=240&resize=240&ssl=1 240w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=320&resize=320&ssl=1 320w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=500&resize=500&ssl=1 500w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=640&resize=640&ssl=1 640w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=800&resize=800&ssl=1 800w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=1024&resize=1024&ssl=1 1024w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=1280&resize=1280&ssl=1 1280w, https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1&w=1600&resize=1600&ssl=1 1600w\" fifu-data-src=\"https:\/\/i3.wp.com\/www.cleantechnology.ca\/wp-content\/uploads\/2021\/03\/ct-default.jpg?ssl=1\" class=\"ff-og-image-inserted\"><\/div>\n<p>CHAR Technologies (<a title=\"https:\/\/www.chartechnologies.com\/\" href=\"https:\/\/www.chartechnologies.com\/\" rel=\"noopener\">CHAR Tech<\/a>) has begun the commissioning process for its Thorold Renewable Energy Facility. This is the company\u2019s first commercial renewable energy and biocarbon production facility.<\/p>\n<p>Commissioning activities are being carried out in multiple stages at the new facility in Thorold, Ont. Feedstock receiving and handling systems are now entering startup to support stable material flow, ahead of commissioning of the <a title=\"https:\/\/www.pulpandpapercanada.com\/char-delivers-first-kiln-to-thorold\/\" href=\"https:\/\/www.pulpandpapercanada.com\/char-delivers-first-kiln-to-thorold\/\" rel=\"noopener\">commercial high-temperature pyrolysis (HTP) kiln<\/a>, which is expected to follow shortly.<\/p>\n<p>Production volumes are expected to increase progressively as systems are tested, integrated and stabilized through the commissioning process. CHAR Tech is targeting a Phase 1 biocarbon production run rate of 5,000 tonnes per year by the end of the first quarter (Q1) of 2026.<\/p>\n<p>\u201cCommissioning is where operating performance, throughput and product quality are established,\u201d says Andrew White, CEO. \u201cWe are bringing systems online in sequence with the goal of reaching stable, saleable production as efficiently as possible.\u201d<\/p>\n<div class=\"code-block code-block-center code-block-11 code-block-article-bill--post-pages\">\n<p>Advertisement<\/p>\n<p><!-- Aricle Billboard -->\n<\/div>\n<p>Upon completion of Phase 1, Char Tech plans to proceed with Phase 2 of construction, including the installation of a second HTP kiln to double the facility\u2019s biocarbon production capacity, the addition of methanation equipment to upgrade synthetic gas into renewable natural gas (RNG) and the building of an on-site RNG pipeline injection point.<\/p>\n<p>The company will provide further updates as Phase 1 commissioning advances and production volumes increase. The Thorold Renewable Energy Facility is structured as a limited partnership with the <a title=\"https:\/\/www.thebmigroup.ca\/\" href=\"https:\/\/www.thebmigroup.ca\/\" rel=\"noopener\">BMI Group<\/a>, of which CHAR Tech is a 50% owner.<\/p>\n<p>The facility is designed to convert up to 35,000 tonnes of wood waste per year into more than 5,000 tonnes per year of biocarbon, the bulk of which is expected to be used locally by <a title=\"https:\/\/dofasco.arcelormittal.com\/\" href=\"https:\/\/dofasco.arcelormittal.com\/\" rel=\"noopener\">ArcelorMittal Dofasco<\/a>, Canada\u2019s largest flat-roll steel producer, under a 2023 offtake agreement to reduce fossil-based carbon in the steelmaking process.<\/p>\n<p><strong><a href=\"https:\/\/blockads.fivefilters.org\"> <\/a><\/strong> <a href=\"https:\/\/blockads.fivefilters.org\/acceptable.html\"> <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>CHAR Technologies (CHAR <span class=\"match\">Tech<\/span>) has begun the commissioning process &#8230; through the commissioning process. CHAR <span class=\"match\">Tech<\/span> is targeting a Phase 1 &#8230; completion of Phase 1, Char <span class=\"match\">Tech<\/span> plans to proceed with Phase &#8230; BMI Group, of which CHAR <span class=\"match\">Tech<\/span> is a 50% owner. The &#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"fifu_image_url":"","fifu_image_alt":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-69965","post","type-post","status-publish","format-standard","hentry","category-news","wpcat-1-id"],"_links":{"self":[{"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/posts\/69965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/comments?post=69965"}],"version-history":[{"count":0,"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/posts\/69965\/revisions"}],"wp:attachment":[{"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/media?parent=69965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/categories?post=69965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/new7.shop\/zerocostfreehost\/index.php\/wp-json\/wp\/v2\/tags?post=69965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}